diamond
caption

New Construction

Construction Inspection requirements & Requests During covid-19


AFPD FEE SCHEDULES

New Construction
Tenant Finish
Fire Protection Systems
Building Systems, Hazmat, Misc.


Development Plan Review
Site Development Guide
Tower 56 Specifications
Development Plan Standard Comments

Electronic Plan Review
Electronic Plan Review Process
For detailed instructions on creating a new contractor portal, click HERE.
For detailed instructions on submitting a permit application in Mobile Eyes, click HERE.
Access the Contractor Permit Portal HERE

CITY OF ARVADA AND AFPD SINGLE PLAN REVIEW INFORMATION
For plans submitted through the City of Arvada eTRAKiT system, complete the permit application in Mobile Eyes as outlined above. Building plans do not need to be submitted through Mobile Eyes if they were sent through eTRAKiT, a permit application only is required to be submitted to AFPD. Please note that there will be permits issued by both the City of Arvada and the AFPD. 

Construction Fire Safety
All new buildings and building additions will be required to have an approved construction fire safety plan provided to AFPD prior to a building permit being issued. Tenant finish projects over 5,000 square feet and those at the discretion of the plan reviewer will also require a fire safety plan.

This plan must address all relevant items from National Fire Protection Association (NFPA) 241 "Standard for Safeguarding Construction, Alteration, and Demolition Operations, and the International Fire Code Chapter 33 "Fire Safety During Construction and Demolition." Please reference the appropriate edition of the International Fire Code based on the jurisdiction.

A sample Construction Fire Safety Plan can be found HERE or the general contractor may submit their own plan as long as all relevant items have been included. 
Additional free training and education can be found HERE

Building Construction
Building Construction Guide
Temporary Fire Apparatus Access Road Requirements

Adopted Fire Codes by Jurisdiction
 City of Arvada  2018 International Fire Code with Amendments
 City of Wheat Ridge  2018 International Fire Code with Amendments
 Unincorporated Jefferson County   2018 International Fire Code with Amendments


Inspection Requests
GENERAL INSPECTION INFORMATION
The normal inspection hours are from 7:30am and 4:30pm, Monday through Friday. All attempts will be made to fulfill the date and time requested, anticipate the request to be fulfilled within 24 to 48 hours. Inspection requests can be made HERE,  and the contact person listed on the permit application will be contacted via an automated email indicating the date and time of the scheduled inspection.

It is required that a representative from the requesting company be on-site for all inspections. That person shall be ready for inspection at least 30 minutes prior to the scheduled time and be able to remain on-site 60 minutes after scheduled time.

INSPECTION CANCELLATIONS
It is the responsibility of the requesting contractor to cancel the inspection at least 24 hours prior to scheduled inspection. If the representative from the requesting company is not on-site during the inspection window, or the work is not complete when the inspector arrives a re-inspection fee will be assessed, and a subsequent inspection shall be scheduled at another date and time.